Installation of a new 440 Volt Supply to the CED Building at Ashford, Kent

IPS Power were employed by Kier to install a new 415volt supply to replace existing switchgear and cables which had time /life expired. This was the main electrical supply to the Network Rail engineering building complex located close to Ashford International Station.

The contract scope comprised supplying all cables and a new DNO cabinet together with commissioning tests and removal of an existing transformer made redundant due to the new works.

All cables were installed in a fully ducted system with five strategically placed pulling manholes built throughout the 350m long cable route

Two 415v cables were installed (4c 240sq mm and 4c 50sqmm) together with associated earth cables.

The excavation proved to be “testing” as it crossed the site of an old goods sidings which exposed many redundant services and disused railway infrastructure. Nevertheless, our safety record on the contract was exceptional with zero accidents and no damage to existing utilities.

Project Details
DATE

May 2018 – Dec 2018

CLIENT

Kier

OPERATOR

Network Rail

Project Gallery

Ashford Cable Pull

Get A Quote Today

At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas.

FIRST NAME *
LAST NAME *
EMAIL ADDRESS *
PHONE NUMBER

SUBJECT

HOW CAN WE HELP?